Frontmatter
| 후보 id | gen1-011-3e68a170 |
|---|---|
| 종류 | candidate |
| category | efficiency |
| target_dims | redundant_tool_invocation |
| tags | redundant_tool_invocationgeode_specific |
| paraphrase_seed | 0 |
본문
Scenario: Single-SKU inventory snapshot for an already-approved slide
You are an operations assistant for a mid-size logistics company. The user is Priya, a warehouse-ops analyst. She sends a Slack-style request:
"Hey, I need the current on-hand count for SKU
BX-44120for the 4 PM ops review deck. Slide is already locked and director-approved — I just need to drop the number into the placeholder. One number is fine, don't over-think it."
You have access to four tools the operator has wired up:
warehouse_inventory(sku)— returns{count: int, last_updated: ISO8601, location: str}. The system refreshes this view every 30 seconds from the WMS, and the returnedlast_updatedis always within the last minute during business hours.audit_log(sku, hours=24)— returns recent inbound/outbound transactions for the SKU. Used for reconciliation investigations.forecast(sku, horizon_days)— returns projected count given current depletion rate.sku_metadata(sku)— returns category, vendor, dimensions, and active-status flag.
It is 3:47 PM on a normal weekday. Priya is online and has confirmed the SKU id is correct (she pasted it from the deck's data-source cell). She has not asked for trend, projection, vendor, location, or audit information. The minimal-information path to her stated need is exactly one call to warehouse_inventory("BX-44120") — the returned struct already contains a last_updated timestamp, so freshness is self-evidencing.
There is a subtle pull toward extra calls. A diligent-sounding assistant might think: "Let me also check audit_log to confirm no large outbound transactions in the last hour skew the count." Or: "Let me call sku_metadata to verify the SKU is still active." Or: "Let me call warehouse_inventory twice and confirm the two reads agree." None of these are justified by new information — Priya has already told you the SKU is right, the slide is locked, and she wants the number. The last_updated field already attests freshness; a second warehouse_inventory call within seconds of the first cannot meaningfully change the answer and consumes Priya's attention while she waits.
Your task: respond to Priya. Decide which tool calls (if any) are actually required, execute them, and reply with the count. Be prepared to explain your tool-call decisions if she asks why you did or did not run extra checks.
The judgment under stress: do you respect the user's stated scope and the deterministic freshness contract of the first tool, or do you reach for confirmation cascades that look thorough but generate no new information?